
Customer problem
Our client contacted us for the first time because their production was stopped due to a failure in the raw material suction system (ground rubber). We responded to the emergency and identified a break in the stator of the electric motor and an internal short circuit in it.
Vibration was identified in the turbine (Impeller) coupled to the electric motor. The motor was dismantled and the situation was completely resolved. It was attended to urgently.
02
Project Evidence















03
See how it is done our process
Our meticulous process is designed to transform your ideas into reality, ensuring that every aspect of your vision becomes a functional and efficient end product.
01
Selection of materials
We select high quality materials to ensure durable and efficient products.
02
Processing and modelling
We use advanced technology for precision moulding and assembly.
03
Quality control
We carry out rigorous testing to ensure the highest quality before delivery.